Garage Conversions in San Diego

Turn unused square footage into real living space.

Additions & ADUs

The most cost-effective way to add living space

Your garage already has a foundation, walls and a roof, which makes it one of the most cost-effective ways to add living space. We handle the full conversion: framing in the garage door, insulation, windows, electrical, plumbing and heating and cooling.

Built as a permitted ADU, a converted garage can become a rental unit or a private suite for family.

What's included

Garage Conversion services

  • Garage-to-ADU

    A full independent unit with kitchen and bathroom.

  • Guest suites

    A bedroom and bath for visiting or live-in family.

  • Home office or studio

    A quiet workspace with proper lighting and climate control.

  • Slab & framing work

    Level the floor, frame the garage door opening and add windows and doors.

  • Insulation & HVAC

    Insulation to meet Title 24 energy code and mini-split heating and cooling.

  • Permits

    Permitted to code, so the square footage counts when you sell.

Our work

Garage Conversion projects

See all photos
ADUs project by California Pro ConstructionADUs project by California Pro ConstructionADUs project by California Pro ConstructionADUs project by California Pro Construction
How it works

A simple, transparent process

You'll know the scope, the price and the schedule before any work starts.

  1. 01

    Free consultation

    We visit your home, walk the space and listen to what you want.

  2. 02

    Written estimate

    A clear, line-item proposal with scope, pricing and a realistic schedule.

  3. 03

    Plans & permits

    We coordinate design and engineering and pull every required permit.

  4. 04

    Build

    A clean, organized job site with regular updates and one point of contact.

  5. 05

    Final walkthrough

    Inspections passed and punch list done. The job isn't finished until you're satisfied.

FAQ

Garage Conversion questions

Do I have to replace the parking I lose?

Under California law, replacement parking generally isn't required when a garage is converted to an ADU. We confirm the details for your property.

How long does a garage conversion take?

Most conversions take 6–10 weeks of construction after permits are issued.

Is a garage conversion cheaper than a new ADU?

Usually. The existing slab, walls and roof reduce costs, though every garage gets inspected first to confirm it can be reused.

Ready to start your project?

Free on-site consultation and written estimate. No pressure, no obligation.

Call Now Free Estimate